Crack Filling
We fill asphalt cracks with hot rubber sealant on driveways, parking lots and private roads. The cracks are blown clean and dry before any sealant goes in, because that is what makes the fill hold.
Learn More
Sealcoating, or asphalt sealing, is a thin coat of sealer spread over pavement you already have. It shields the surface from sun, water and the oil that drips out of parked cars. On a driveway it puts the black back and slows the graying. On a parking lot it also gives you a clean surface for fresh lines.
Sealer only helps pavement that is sound underneath, so the prep is most of the job. The surface gets blown clean of dirt and loose material, and pressure washed where it is needed. Cracks get filled with hot rubber crack filling and oil spots get scraped and primed. Then the sealer goes down and traffic stays off while it cures. We sealcoat driveways and parking lots around North Zulch and the Brazos Valley.
Tell us about the driveway, lot or road. We come out, look at the site and give you a written estimate.
Asphalt turns gray because the sun dries out the binder that holds the rock together. The Asphalt Institute describes old surfaces that turn dry and brittle, then start shedding rock. Sealer is a coating over that surface. It slows the drying and keeps water and fuel drips out of the top layer.
Sealer does not add strength. It is a coating, not pavement. It will not hold up a soft base, fill a pothole or close alligator cracking. Those areas need asphalt repair first, and a lot with a failed base needs more than sealer.
One note on the name. TxDOT and Texas county road crews call chip seal a seal coat or a surface treatment. That job sprays asphalt and rolls rock into it to build a new surface. Sealcoating builds nothing. It coats pavement you already have.
The NOAA weather station in Madisonville averages about 100 days a year at or above 90 degrees. College Station runs a little higher. That much sun is hard on a black surface, and it is why driveways here gray out.
The Asphalt Institute says a well built driveway or lot should not need sealing for about 2 to 5 years. Its driveway guidance puts the recoat interval at every two to five years after that. So sealcoating is upkeep you repeat on a schedule. Traffic and standing water move the timing either way.
New asphalt gets left alone for a while. Sealer specifications call for a minimum of four weeks of cure before any coating. The Asphalt Institute says to wait until the driveway is several months old. Madison County's driveway permit checklist puts sealing an existing asphalt driveway in the no permit column.
A parking lot takes more punishment than a driveway. Cars turn on the same spots, trucks drag across the entrance, and oil collects where people park. Sealer specifications for lots call for two coats over the whole surface. A third coat goes over entrances, exits and drive lanes, where the wear is worst.
We plan the work in phases with you so the business can keep operating. Half the lot gets sealed while the other half stays open, then the work moves over. Churches, motels, shops and equipment yards usually get sealed on their slow days.
Fresh sealer has to cure before paint touches it. The specification calls for a full day of drying after the last coat. That is why sealing and parking lot striping get scheduled back to back. If the layout is changing, the old lines get blacked out before the sealer goes down.
Free estimates and site visits across the Brazos Valley and about 60 miles around North Zulch.
(979) 595-5944From the first call to the day you can drive on it, here is how it goes.
Call or text (979) 595-5944, or send the form on this page. Tell us what the drive, lot or road is doing now.
We come out, look at the ground, measure the area and see where the water goes. Then the estimate spells out the square footage, the base work and the thickness.
We shape the site so water runs off it, then put the base down and compact it. Soft spots and failed areas get dug out and rebuilt before anything goes over them.
Hot mix asphalt is laid with our LeeBoy pavers and rolled while it is still hot. Chip seal jobs get emulsion sprayed, then rock spread over it and rolled in.
We clean the site up before we leave and tell you how long to stay off the new surface. Striping or sealcoating gets scheduled once the pavement has cured.
Common questions about sealcoating across the Brazos Valley and about 60 miles around North Zulch. If yours is not here, call and ask.
We fill asphalt cracks with hot rubber sealant on driveways, parking lots and private roads. The cracks are blown clean and dry before any sealant goes in, because that is what makes the fill hold.
Learn More
We stripe parking lots across the Brazos Valley: fresh layouts on new pavement and faded lots brought back. Stalls, arrows, stop bars, crosswalks, fire lanes, curb painting and accessible spaces, in traffic paint.
Learn More
We repair potholes, sunken spots, crumbling edges and failed patches in asphalt driveways, parking lots and private roads. Bad pavement is saw cut out, the base rebuilt where it failed, then a hot mix patch is compacted in.
Learn MoreWe grade for drainage, put the base down and compact it, then lay hot mix asphalt on top. The ground under the pavement decides how the job holds up.
LeeBoy asphalt pavers, a double steel drum roller, dump trucks, a lowboy trailer, skid steers and a mini excavator. The base work and the paving run on our own machines.
We pave driveways at houses and ranches, parking lots for businesses and churches, and private roads shared by several homes. Residential and commercial work runs through the same company.
Real reviews from real paving jobs, 40 reviews on Google.
They were professional, efficient, and delivered high-quality work. The team showed up on time, and left the area clean when they were done. You can tell they take pride in their work. Highly recommend them to anyone needing asphalt repair!
JEJ Concrete and Asphalt Recovery went above and beyond from start to finish. Professional, responsive, and they take real pride in their work. You can tell they know what they’re doing—the quality and attention to detail speaks for itself. They showed up when they said they would, got the job done efficiently, and left everything looking better than expected. It’s hard to find companies that still operate with this level of integrity and consistency. If you need concrete or asphalt work done right the first time, JEJ is the one to call. Highly recommend.
Great quality sealer jobs and customer service! Just an all around good company

What does driveway sealcoating cost in Texas? National cost guide ranges per square foot, driveway sizes, parking lot rates and what moves the price.
Read more →
Parking lot paving cost in Texas: national cost guide ranges per square foot and per space, a lot size table and what moves the price of a new lot.
Read more →
What Texas requires when a parking lot is striped or restriped: accessible space counts, van stalls, aisle widths, signs, fire lanes and market costs.
Read more →Tell us what needs paving, sealing, patching or striping, and we will come out and look at it. Call or text (979) 595-5944, or send the form with the details of the job.
Tell us about the driveway, lot or road. We come out, look at the site and give you a written estimate.